Talks, Documents, Opinions, etc.

  • 2003-06-09 -- Proceedings for Elba talk: postscript and LaTeX source
  • 2003-05-30 -- The CDF Silicon Vertex Trigger (talk at Elba detector conference): ppt, pdf, and streaming video
  • 2003-05-09 -- Some SVT benchmarks vs time: ps and ppt
  • 2003-04-30 -- "Potential B trigger improvements" (CDF B meeting): ps and ppt
  • 2003-04-14 -- "Studying bottom and charm decays at Fermilab's Tevatron Collider" (Cornell physics dept seminar): ps, pdf, and ppt.
  • 2003-03-11 -- "The CDF Silicon Vertex Trigger" (LEPP Journal Club seminar): ps, pdf, and ppt
  • 2003-02-27 -- Pre-blessing for D0 to mu mu analysis (with Rob Harr, for B meeting): ps and ppt
  • 2003-02-17 -- Progress report on D0 to mu mu analysis (with Rob Harr, for hadronic B meeting): ps and ppt
  • 2003-02-10 -- Progress report on D0 to mu mu analysis (with Rob Harr, for hadronic B meeting): ps and ppt
  • 2003-01-13 -- Progress report on D0 to mu mu analysis (with Rob Harr, for hadronic B meeting): ps and ppt
  • 2002-11-26 -- SVT polling script output after 2 months (for weekly SVT meeting): ps and ppt
  • 2002-11-14 -- Assorted slides, some a bit too detailed, about SVT: ps and ppt
  • 2002-10-08 -- SVT polling script first prototype (for weekly SVT meeting): ps and ppt
  • 2002-10-03 -- My one and only contribution to the silicon failure task force: graph, and Python program
  • 2002-10-01 -- Installing updated SVT constants in the online hardware database: an example)
  • 2002-09-29 -- Checking new SVT constants in svtsim (an example)
  • 2002-09-06 -- SVT status report for CDF collaboration meeting: PDF or powerpoint
  • 2002-08-22 -- Report on recent SVT improvements, for CDF B group
  • 2002-08-13 -- Backup slides on SVT modifications needed to handle Run 2b SVX geometry: PDF and powerpoint
  • 2002-08-02 -- Some brief instructions on updating the code that is shared between offline svtsim and online svtvme libraries
  • 2002-07-26 -- First CDF Run II Results (Fermilab Wine & Cheese seminar): PDF, powerpoint, and streaming video
  • 2002-07-12 -- Slides from SVT workshop
  • 2002-07-01 -- Start of a list of things SVT pager carriers need to know
  • 2002-05-20 -- SVT/svtsim comparision for runs 142000,142009 (for Un-ki)
  • 2001-12-07 -- SVT as a L2 processor (for L2 review): postscript and powerpoint
  • 2001-11-15 -- svtsim status (CDF simulation meeting) postscript and powerpoint
  • 2001-11-01 -- SVT Database Use (trigger hardware meeting)
  • 2001-10-18 -- Level 2 Magical Mystery Board talk at Trigger Hardware meeting: overview slide 1, slide 2, slide 3; preliminary specification; and Myron's Magic Bus specification, for reference.
  • 2001-09-11 -- Plan for SVT/TS kludge postscript and powerpoint
  • 2001-08-16 -- Can we tag on SVT at L2 (CDF TDSWG meeting)? postscript and powerpoint
  • 2001-07-12 -- SVT status/plans (CDF commissioning meeting): postscript and powerpoint
  • 2001-07-11 -- svtsim overview (trigger operations meeting)
  • 2001-03-20 -- SVT simulation and initialization (for weekly SVT meeting): slides, map set example, random test example
  • 2001-03-08 -- SVT status (for trigger hardware meeting)
  • 2001-02-08 -- SVT status (for trigger hardware meeting) 1, 2, 3
  • 2001-02-08 -- COT simulation status (free to a good home!) and plots
  • 2001-02-08 -- COT Signal Analyzer (flash ADC board) short talk for CDF commissioning meeting
  • 2001-02-06 -- Status and plans for offline svtsim (for workshop)
  • 2001-02-05 -- Status and plans for SVT GhostBuster board (for workshop)
  • 2001-02-05 -- Status and plans for SVT cold start from Run_Control (for workshop)
  • 2001-02-05 -- Status and plans for online svtsim (for workshop)
  • 2000-12-22 -- Rough sketch of board to do "ghost track" removal (and more); and Mel's note
  • 2000-12-19 -- Status/plans for SVT simulation code (for SVT meeting)
  • 2000-12-12 -- Notes from DB export review; and final report
  • 2000-12-12 -- Status/plans for SVT Run_Control download code (for SVT meeting)
  • 2000-09-14 -- Status of offline COT simulation code (simulation meeting)
  • 2000-09-07 -- Progress report on SVT commissioning (DAQ meeting)
  • 2000-07-20 -- Plan for FADC board to read out COT ASDQ monitor outputs, for CDF DAQ meeting
  • 2000-05-17 -- Sketchy plan for e and mu triggers in the commissioning run
  • 2000-05-04 -- svtsim status (for CDF trigger simulation meeting)
  • 2000-04-13 -- Status of offline COT simulation (for CDF detector simulation meeting)
  • 2000-04-07 -- CDF Paper Seminar on W Width PRL
  • 2000-04-03 -- Initialization of SVT boards from Run Control (for workshop)
  • 2000-04-03 -- Updated simulation plans (for workshop)
  • 2000-04-02 -- Overview of SVT software tasks (for workshop)
  • 2000-03-29 -- Proposal for SVT board-level C code (for workshop)
  • 2000-03-16 -- Simulation examples from the Run I W mass analysis (CDF detector simulation meeting)
  • 2000-02-29 -- Gauge Boson Studies at the Tevatron Collider: talk given at LaThuile 2000
  • 1999-07-22 -- Hit Finder production "signoff" talk at CDF DAQ meeting
  • 1999-06-09 -- Solved and unsolved mysteries in Run I CTC tracking (for CDF tracking group meeting)