Status

Oct. 11, 2005 - The Backplane came in today.
Installed it on the Electronics Box and plugged the LVDS-Slot_8 SAB with power from a lab supply.
Connected it to the "Master" ADC Board, which has a small counter, generating clocks of various periods on the LVDS lines, for connectivity testing.
Scoped some B-LVDS signals on the backplane. They seem to be fine. Have to test more.

See here a picture of the back of the Electronics Box (the smaller chassis on the right) with the Slot_8 SAB (the small green board with the red LED) and with the LVDS connections to the "Master" ADC Board in the new VME Crate (the taller chassis on the left):

June 15, 2005 - Presentation: QEB Implementation I.

May 12, 2005 - Started.



 